300zx gtr r35 holinger syvecs

Discussion in 'Member's Garage' started by badxtc, Apr 14, 2017.

  1. badxtc

    badxtc kirby's bitch

    ok so a little photo bomb time, so as it stands the manifold are 95 % finished just need to weld the EGTs on and the gate pipes and it all done they are all welled up and fit (turbos are not clocked in photos just on) these are the bigger 43mm ID and 48mm OD.
    He is starting on the dumps now then gate and the 4inch cutouts, then all that part of it should be done.

    we will configure the ash massive side mounts to work with this set up for now till me work out what we are going to need in terms of the final intercooler set up, im still pushing side mounts at this point i recon i can make really huge ones to get what we need out of them (water to air is not something im keen on atm)
    next would be the 4inch intakes as well and intercooler piping, then i need to bring her home and pull the engine out and do all the oil lines water lines return line etc etc then that should be it we should be ready to start her up again.

    she is coming together slowly slowly , this guy has only had the car for i think 4 weeks now look how far he has come, all will be revealed about him latter.

    we also will not be using trent for chequered tuning as the car will be making a little bit more power then his dyno can take, i do have the syvecs king here in Melbourn as he is there distributer and know the syvecs 100% i also have access to him 24 7 and i need that support when out racing,

    on a side note roll racing at Calder park there is no leader board so mph and times are not a thing so i can roll race all the time and can not get kicked out, we are going to set up for this as well im supper excited for this.

    i hope you guys enjoy these photos , thats it for now
    cheers 434005300_716210294060137_1011017625756020176_n.jpg 433883415_1337035570321598_3027592464590944049_n.jpg 434001616_1121296642552822_3746991662259471627_n (1).jpg 434018219_1552533872269488_5674075718664138139_n.jpg 433886634_8066349486726828_6082176944167326121_n.jpg 434001616_1121296642552822_3746991662259471627_n.jpg 434111033_956581225831189_2895758521047483897_n.jpg 433697812_2154841754866650_7262346144017307824_n (1).jpg 433807165_7697961880236775_1713944919206607895_n.jpg 433830118_1359416901443391_7500830483904248776_n.jpg
    434005300_716210294060137_1011017625756020176_n.jpg 433883415_1337035570321598_3027592464590944049_n.jpg 434001616_1121296642552822_3746991662259471627_n (1).jpg 434018219_1552533872269488_5674075718664138139_n.jpg 433886634_8066349486726828_6082176944167326121_n.jpg 434001616_1121296642552822_3746991662259471627_n.jpg 434111033_956581225831189_2895758521047483897_n.jpg 433697812_2154841754866650_7262346144017307824_n (1).jpg 433807165_7697961880236775_1713944919206607895_n.jpg 433830118_1359416901443391_7500830483904248776_n.jpg
     
    IB and lidz like this.
  2. badxtc

    badxtc kirby's bitch

    few extra photos, it's getting there slowly, it's a massive job, we think it should be finished soon few weeks away id say, when i get her home then the fun starts,
    i will post photos of the intercooler piping when he starts i am using the ash missives coolers till i sort it out, but i will be using side mounts, this will be a decision for a later date, not something i want to think about atm, 80% will not be front mount,
    i need to pull the engine out and do all the water and oil line and other small things, then i will stop and enjoy it.
    i still need to dry sump it and sort out the cooler side of things but this can wait, no rush at this point of the build, all the hard crazy work is done, the rest is not too bad in terms of available products to buy, but it will take time, it's come a LONG LONG way and im over the moon to say the least.
    the engine still needs to go down and back but this will all take place when setting up the dry sump once that is done then the big task of balancing the car up as best we can, over all it is much much lighter now so this is something i must do. lot more work to do

    hope you guys enjoy this project,
    cheers alex

    433872939_265448189964577_1012838978766586401_n.jpg 434043614_383296561283867_7420257718805648374_n.jpg 433975772_2830082153809938_5199961000250804043_n.jpg 433997429_1090916558625734_8915627755934526313_n.jpg 433960849_787896946102578_1000995952604346484_n.jpg 433997417_777405467649537_5927824777255313749_n.jpg 433872939_265448189964577_1012838978766586401_n.jpg 434043614_383296561283867_7420257718805648374_n.jpg 433975772_2830082153809938_5199961000250804043_n.jpg 433997429_1090916558625734_8915627755934526313_n.jpg 433960849_787896946102578_1000995952604346484_n.jpg
     
    MintZ32 and lidz like this.

Share This Page